17. The operator of an industrial wastewater or process water treatment system shall drain the basin of deposits of hazardous materials where such a system has not been in operation for at least 6 months.
He shall also take the necessary measures to prevent the hazardous materials accumulated in the basin from reducing the efficiency of the treatment system.